Concrete Cable Troughing For PV Solar Farm Power Cable Protection

By Chris Dodds on 13th March, 2014

Follow us on LinkedIn

Concrete Cable Troughing For PV Solar Farm Power Cable Protection

Anderton Concrete Cable Troughing

 

Today, T&D have delivered 435 metres of Concrete Cable Trough to provide cable protection to low voltage PV cables at Pitts & Crapnell PV Solar Farm project in Somerset UK.

Concrete Cable Trough Benefits

  • Cable troughs are non-conductive to electricity
  • Cables buried at depth are unexposed to environmental change
  • High strength cable trough for long term cable protection
  • Cable trough allow easy access for cable repair, jointing and cable additions

Concrete Cable Trough

Anderton concrete cable troughs are available in 100mm, 130mm, 150mm, 190mm, 250mm and 350mm widths.

T&D UK provide a nationwide delivery service for concrete cable trough by Hiab vehicles.

As well as PV solar farm projects, concrete cable troughs are extensively specified and supplied by T&D to railway, highway, power, telecom and water projects for electrical infrastructure protection.

T&D have now provided an extensive range of Electrical Equipment to PV Solar Farm Projects :

PV Solar Farm - Concrete Cable Trough Protection

Invitation

Thorne & Derrick are inviting you to join LinkedIn’s fastest growing Discussion Group : Low & High Voltage Power, Cabling, Jointing, & Hazardous Area Electricals (LV-HV).

Discussion subjects include cable installations, cable jointing, electrical substation, overhead line and electrical construction at LV, 11kV, 33kV and EHV.

Network, engage and promote your profile, company or products with over 10,000 influencers.

 

linkedin-logo Click Here To Join

Adobe

Anderton Concrete Cable Trough - Underground Cable Protection





Category:  PV Solar Farms

Go back to blog index