Duct Seals & Duct Sealing

CSD RISE Cable Duct Sealing System

 

Working with BBESL, T&D have supplied the CSD RISE Cable Duct Sealing System to the Port Ann 132kV substation in Lochgilphead, Scotland.

The water and gas tight cable duct seals will provide effective and reliable protection to 200mm diameter high voltage cable ducts.

CSD RISE CABLE DUCT SUBSTATIONS

Peace of mind cable duct sealing with CSD RISE kits, the technically advanced cable duct seal system which has virtually replaced putty and expanding type foams for electrical utility projects. The RISE Cable Transit System is quick and flexible, making it easier to achieve an effective gas and watertight seal.

Recent T&D CSD RISE Duct Seal Projects include - London Underground (BAM Nuttall & VVB), Whitelee Wind Farm (BBESL), Diageo Cameron Bridge Distillery (Dalkia), Ineos Clor (Boulting), HMNB Faslane (FES), Centrica York Gas Platform (Heerema), Thameslink (BB), Hole House Gas Storage (AMEC), Olympic Park (EDF) plus many HV substations up to 132kV at UKPN, SSE, Scottish Power, CE Electric, UU and the National Grid EA sites.

132kV Cable Stripping, Cable Preparation & Cable Jointing Tools

 

 
  • Further Reading
 

Invitation

Thorne & Derrick are inviting you to join LinkedIn’s fastest growing Discussion Group : Low & High Voltage Power, Cabling, Jointing, & Hazardous Area Electricals (LV-HV).

Discussion subjects include cable installations, cable jointing, electrical substation, overhead line and electrical construction at LV, 11kV, 33kV and EHV.

Network, engage and promote your profile, company or products with over 10,000 influencers.

linkedin-logo Click Here To Join