"Teaching apprentices where and how they should spike or spear a splice to save all the cables for rebuilding a splice or just changing out the lead sleeve."
John McGaughan, Cable Systems Operations Specialist at TECO.
See also : The Perfect 13.2kV Nub
"This piece of equipment was built back in the late 70's. I think we replaced the pump and the hoses but that's about it. The company who built it was Gibson Hydraulics in Tampa ,Florida - it has served us well and as you can see. Haven't speared or psiked a "hot" cable so far. And I hope that our crew's never will."
Thorne & Derrick are inviting you to join LinkedIn’s fastest growing Discussion Group : Low & High Voltage Power, Cabling, Jointing, & Hazardous Area Electricals (LV-HV).
Discussion subjects include cable installations, cable jointing, electrical substation, overhead line and electrical construction at LV, 11kV, 33kV and EHV.
Network, engage and promote your profile, company or products with over 10,000 influencers.