138kV HPFF Cable Preparation Prior To Installation Of G&W Cable Termination

By Chris Dodds on 18th November, 2016

Follow us on LinkedIn

138kV HPFF Cable Preparation Prior To Installation Of G&W Cable Termination

Pictured: 138kV HPFF Cable Preparation Prior To Installation Of G&W Cable Termination

Image: Terry Perona Manager Underground Cable at FirstEnergy

Contractor W.A. Chester prepares 138KV HPFF cable to receive new G&W termination.

138kV HPFF Cable Preparation Prior To Installation Of G&W Cable Termination

  • Further reading

110kV G&W Cable Termination - HPFF High Pressure Fluid Filled

115kV G&W Oil Filled Straight Joint

Upskilling To EHV - Training Opportunities For Cable Jointers With G&W Electric

Thorne & Derrick Specialist Electrical Distributor

Established since 1985, T&D distribute the most extensive range of LV, MV & HV Cable Jointing, Terminating, Pulling & Installation Equipment - contact us today for a competitive quotation.

Key Products : MV Joints & Terminations, Cable Cleats, Duct Seals, Cable Transits, Underground Cable Protection, Jointing Tools, Feeder Pillars, Cable Duct, Earthing & Lightning Protection, Electrical Safety, Cable Glands, Arc Flash Protection & Fusegear.

Distributors for : 3M, Pfisterer, Nexans Euromold, Elastimold, Catu, Roxtec, Emtelle, Centriforce, Lucy Zodion, Alroc, Hivotec, Cembre, Prysmian, Ellis Patents, ABB & Furse.

Cable Joints Terminations Tools Cleats

 

Invitation

Thorne & Derrick are inviting you to join LinkedIn’s fastest growing Discussion Group : Low & High Voltage Power, Cabling, Jointing, & Hazardous Area Electricals (LV-HV).

Discussion subjects include cable installations, cable jointing, electrical substation, overhead line and electrical construction at LV, 11kV, 33kV and EHV.

Network, engage and promote your profile, company or products with over 10,000 influencers.

 

linkedin-logo Click Here To Join




Category:  Cable Jointing - PhotoBlog

Go back to blog index