![]() |
|
home | contact | team t&d | group websites | markets | exports | blog |
![]() |
|
Oil & Gas UK recently revealed that North Sea costs for decommissioning are expected to rise to £35 billion in the next 25 years.
The following infographic guide by Claxton Engineering provides all the key details from the report and looks at both the costs operators are expecting and the region's future trends.
Claxton Engineering rigless abandonment experience can signficantly reduce the cost of platform well abandonment, which Oil & Gas UK estimate stands at £4.8m per well.
View post on imgur.com
Watch BP Build An FPSO In 1 Minute (Time Lapse Video)
Celebrating 50 Years of UK Offshore Oil & Gas UK Animation
Thorne & Derrick are inviting you to join LinkedIn’s fastest growing Discussion Group : Low & High Voltage Power, Cabling, Jointing, & Hazardous Area Electricals (LV-HV).
Discussion subjects include cable installations, cable jointing, electrical substation, overhead line and electrical construction at LV, 11kV, 33kV and EHV.
Network, engage and promote your profile, company or products with over 10,000 influencers.
Category: Hazardous Area Electricals & Lighting