Nexans Windlink High Voltage Cable Jumpers for Wind Farm Applications

By Chris Dodds on 4th October, 2012

Follow us on LinkedIn

Nexans Windlink High Voltage Cable Jumpers for Wind Farm Applications

Nexans Windlink HV Cable Jumpers - 33kV 42kV

Wind Farm High Voltage Cable Jumpers

 

Nexans WINDLINK solutions can outfit a complete wind turbine, assuring that all elements are fully interoperable and compatible. Nexans produce every cable in the nacelle, tower and base: from connection cables for generators, loop cables and fixed installation cables.

Nexans WINDLINK Cable Solutions

Nexans WINDLINK Cable Solutions Features & Benefits

  • World supplier of all cables for wind turbines
  • Innovative and customized wind power solutions
  • Customized sets and special kits for easy end-assembly
  • On-Time-In-Full (OTIF) delivery through advanced logistics
  • Fire performance and protection through halogen-free insulation and sheaths
  • Technical and R&D support for total life management
  • International certification including UL/CSA, standardization and interconnectivity

 

Pictured: Pre-assempled MV Transformer & Switchgear Connection With Euromold-Products

Nexans WINDLINK Medium Voltage Jumpers For Wind Application

Medium Voltage Jumpers For Wind Application

Pre-installed MV Windlink cable Jumper MV Nacelle connection for Windturbine applications. Preinstalled windlink cable jumper sets. Installed with Euromold accessories, connector and /or termination up to 42kV.
Voltage and partial discharge test in accordance with IEC 60502 – 2 individual documented.

 

 
  • Further Reading

 

Invitation

Thorne & Derrick are inviting you to join LinkedIn’s fastest growing Discussion Group : Low & High Voltage Power, Cabling, Jointing, & Hazardous Area Electricals (LV-HV).

Discussion subjects include cable installations, cable jointing, electrical substation, overhead line and electrical construction at LV, 11kV, 33kV and EHV.

Network, engage and promote your profile, company or products with over 10,000 influencers.

linkedin-logo Click Here To Join

Adobe

exans WINDLINK Connection System





Category:  HV Cable Jointing & Terminating

Go back to blog index