home | contact | team t&d | group websites | markets | exports | blog |
![]() |
|
HV Cable Jointers - Nationwide High Voltage Cable Jointing Services - Hunter Electrical Services
Hunter Electrical Services number 25 staff, including QS, Contracts Manager, Site Agent, Electrical Foremen, 6Nr. HV High Voltage Cable Jointers and Electricians all Comp-ex trained. Hunter complete work all over the world and in the North Sea ranging from 1k to 1 million. Hunter also have a few manufacturing sites that they have had a presence on site for a few years (SCA papermill, Heraeus Quartz). Hunter pride themselves on completing high voltage cable projects to the highest of standards with an excellent safety record.
The annual turnover for 2011 was over 2.9 million and they have been trading since 1996. We can complete projects either doing the Principle role or a Sub-Contrator role. Hunter have completed over 300 wind turbines in the UK and all High Voltage Jointers are trained to terminate cable ends up to 66KV HV - this includes Pfisterer cable terminations which are normally used offshore on wind farms and on Network Rail.
Hunter Electrical Services - HV Cable Jointing Services ...........
• HV and LV Cable Installations
• HV and LV Cable Jointing and Cable Terminations
• Switchgear and Transformer Installations
• HV Ring-main and Sub-main Installations
• Building and Installation of HV Distribution Sub-Stations
• Cable Fault Location and Repair
• Thermal Imaging Surveys of Switchgear and Ancillary Equipment
• High Voltage Pressure Testing and Commissioning
• HV Switchgear Protection System Secondary Injection Testing
• Refurbishment, Upgrades and Modifications to Existing Equipment and Systems
Hunter Electrical Services
North Farm House
Warden Law
Houghton Le Spring
DH5 8LX
Tel: 0191 584 9799
Email: [email protected]
HV and LV Cable Installations
Hunter's highly experienced team of HV/LV cable jointers is typically able to undertake work on projects, up to 66kVs, on typical 3 core and 1 core cables such as XLPE, PILC, PILC/SWA and EPR using heat shrink or cold appled cable joints and cable terminations.
HV and LV Cable Jointing and Terminations
Straight Though Joints
Breach Joints
Pfisterer Terminations
Transition Joints
Trouser or Loop Joints
Trifurcation Joints
Desimlar Sized Combination Joints
Heat or Cold Applied Terminations
Transformer Installations
Cast Resin
Oil Filled
Guroflex, G38A oil resin and Petroleum Bitumen resin cable filled boxes
HV Ring-main, Switchgear and Sub-main Installations
ABB Switchgear
Schneider Switchgear
Building and Installation of HV Distribution Sub-Stations
Our experienced and fully trained in-house operative are able to install all related civil works for the installation of HV and LV specialist services
We have completed numerous Sub Station projects from full Principal Contactor to small fit out.
Cable Fault Location and Repair
TDR testing
Cat Scanning
Thermal Imaging Surveys of Switchgear and Ancillary Equipment
Using the very latest FLIR E50
High Voltage Pressure Testing and Commissioning
5k Insulating Resistance
DC Pressure Test
AC Pressure Test
Category: HV Cable Jointing & Terminating